Project
Events Space Timber Sand & Seal
  • Contractor Direct to Client
  • Products Timber

The Brief

A premium client at Battersea Power Station approached LD to restore a herringbone timber in an events space that had become scratched and tired through regular use. While the floor remained structurally sound, its appearance no longer reflected the quality of the surrounding environment.

The client requested a solution that would refresh the floor visually while protecting the timber and extending its service life.

 

Furnished Event Space with timber floor - Loughton Direct

 

Loughton Direct assessed the existing timber floor

and confirmed that full replacement was not needed.

Instead, a sand and seal was recommended as a practical,

cost-effective way to restore the space.

Events space timber floor after oil has been applied - Loughton Direct

Curious as to how Loughton Direct Timber Maintenance would make your floors look? Arrange a free sample test area now!

Free Sample Test Area

 

Events Space Timber maintenance - Loughton Direct

Events space timber sand and seal - Loughton Direct

By refurbishing the original floor, the client was able to retain the existing herringbone pattern while avoiding the cost and disruption of a full uplift and reinstall. The timber was sanded throughout to remove surface wear and scratches, creating a clean, even base.

Two coats of oil were then applied to protect the floor and bring out the natural variation and character of the timber. The result is a refreshed herringbone floor that improves the overall appearance of the events space while helping to extend the life of the existing installation

Events space timber floor after being sanded and sealed - Loughton Direct